Pump Station
After leaving the treatment plant the water flows through 8,375 feet of 30-inch diameter concrete cylinder pipe to the Division Street Pumping Station.
The water from this booster station is pumped to the Mountain View reservoir in Oregon City where it feeds into both the Oregon City and West Linn distribution system.